Edward Waters University Dining Renovation
Jacksonville, Florida
Reliant Construction proudly partnered with Sodexo to deliver a comprehensive renovation of the dining facilities at Edward Waters University’s George W. Collins Student Center. This project transformed the second-level resident dining space into a modern, functional, and efficient environment designed to enhance the student experience.
Project Overview
Reliant Construction served as the general contractor for this dining renovation, executing all phases of construction from demolition through final turnover.
The project included upgrades to dining areas, kitchen infrastructure, restrooms, and finishes—while maintaining strict adherence to schedule, safety, and quality standards.
Scope of Work
The renovation involved a full interior transformation of the existing dining facility, including:
- Selective demolition and reconfiguration of existing spaces
- Installation of new ADA-compliant restrooms
- New millwork, flooring, ceilings, and interior finishes
- Upgraded mechanical, electrical, and plumbing systems
- Installation of commercial kitchen equipment and service areas
- New menu boards, fixtures, and dining enhancements
The project required detailed coordination across multiple trades to ensure seamless integration within an active campus environment.
Schedule & Execution
A clearly defined and well-managed construction schedule was critical to the success of this project. Working within a university setting required precise planning to minimize disruption to campus operations and ensure the facility was ready for use when needed.
Reliant Construction developed and executed a detailed sequence of work that included inspections, interior buildout, finishes, equipment installation, and final turnover.
Why timelines matter:
In environments like higher education, timing is everything. A missed deadline can directly impact students, staff, and daily operations. By maintaining strict schedule control, coordinating trades efficiently, and proactively addressing challenges, Reliant Construction ensured:
- Minimal disruption to campus activities
- Seamless coordination between trades and inspections
- On-time delivery aligned with operational needs
- A smooth transition from construction to occupancy
Our team understands that delivering on schedule is just as important as delivering quality—and this project reflects that commitment.
Design & Functionality
This renovation modernized over 8,000 square feet of dining space while maintaining the building’s existing footprint and occupancy.
Enhancements included:
- Improved dining flow and seating layouts
- Increased efficiency in kitchen and service areas
- Contemporary finishes and upgraded aesthetics
- Code-compliant life safety and accessibility improvements
Project Highlights
- Executed within a tight, mission-critical schedule
- Coordinated complex multi-trade construction activities
- Maintained high safety and quality standards throughout
- Successfully completed within an active campus environment
Our Commitment
From preconstruction through completion, Reliant Construction provided full-service project delivery—managing scheduling, coordination, and execution to ensure a successful outcome for both Sodexo and Edward Waters University.
Let’s Build What’s Next
Whether you’re planning a campus renovation, commercial build-out, or complex interior transformation, Reliant Construction delivers projects with precision, accountability, and results.
Contact our team today to discuss your next project and see how we can bring your vision to life.