CCV School District Trades Shop
Cripple Creek, Colorado
Reliant Construction partnered with the Cripple Creek Victor (CCV) School District to deliver a new 7,200-square-foot trades shop facility designed to support hands-on technical education. Built as a pre-engineered metal structure, this project reflects a practical, efficient construction approach tailored to durability, functionality, and long-term use.
Project Overview
The new facility was constructed to provide a dedicated environment for construction trades training. The building was designed and built to accommodate both instructional and operational needs, with a focus on flexibility and performance.
The completed facility includes:
- A large open shop area for hands-on training
- Men’s and women’s restrooms
- Office and administrative space
- Utility and storage rooms
- A single-bay garage for equipment and vehicle access
- Expanded site features including parking and outdoor gathering areas
Efficient Building Systems & Construction
The project utilized a pre-engineered metal building system to streamline construction, reduce timelines, and provide a durable structure suited for heavy-use educational environments. Large overhead doors were incorporated to allow for movement of equipment and materials, supporting real-world training scenarios.
Reliant coordinated all major building systems to ensure seamless integration during construction, including:
- Structural foundation design aligned with the metal building system
- Mechanical, electrical, and plumbing systems installed to meet the functional demands of a working trades facility
- Interior layouts optimized for workflow, safety, and accessibility
Site Development & Infrastructure
Construction included full site development to support the new facility and its daily use. Work included:
- Site grading and drainage improvements
- Parking layout and ADA-accessible routes
- Curbing, paving, and access drives
- Utility coordination to support building operations
These elements were constructed to ensure long-term performance, safe access, and ease of maintenance.
Quality Control & Project Execution
Throughout construction, Reliant maintained a hands-on approach to project delivery, ensuring all work aligned with the project documents and client expectations. This included:
- Review and coordination of shop drawings and submittals
- On-site visits to monitor construction progress and quality
- Ongoing communication with project stakeholders to address field conditions and maintain schedule
By maintaining close oversight and coordination, the team delivered a facility that meets both functional and performance goals.
Built for Hands-On Learning
The completed trades shop provides CCV students with a purpose-built environment that mirrors real-world construction settings. From structural systems to interior functionality, every aspect of the project was executed to support practical training and long-term durability.
Ready to Build What’s Next?
Whether you’re planning a new educational facility, expanding your operations, or looking for a trusted construction partner, Reliant Construction brings the experience and execution needed to deliver results.
Contact our team today to get started on your next project.